Masonry Install Supplies
- 700 tons of crushed recycled concrete
- 1000 gallons of fuel for rental equipment
- 15 pails (5 gallon) of cure & seal
- 185 cfm air compressor - 2 month rental
- aerial lift - 2 month rental
- skid steer - 2 month rental
- backfill material
- topsoil
- rebar installation
- Caulk for control joints
- backer rod for control joints
- monument signage

INDEPENDENT SHOTCRETE WILL BE ON SITE MID APRIL

 Formwork Material
   * 2400 linear feet of 2x4
   * 1800 linear feet of 2x6
   * 60 sheets of 4x8 plywood
   * 240 linear feet of 3/4” x 6” pvc board
   * 240 linear feet of 1” x 12” pvc board
    * two 25 lb boxes of star drive decking screws


IF YOU OR YOUR COMPANY WOULD LIKE TO DONATE ANY OF THESE ITEMS PLEASE CONTACT US!

JULY 7th 2017

DONATION MATERIALS AND CONSTRUCTION NEEDS 

Skatepark Groundbreaking Ceremony

Footer and Retaining Wall 

March 2018


FOLLOW OUR PROGRESS